LHBP – BUDAPEST LISZT FERENC INTERNATIONAL AIRPORT plates LHBP INSTRUMENT APPROACH CHART – ICAO ILS OR LOC RWY 31R. Charts, abbreviated plain language text; English, Hungarian. 7, Charts .. See TWY segments on Chart ADLHBP PDC-1 and PDC In. LHBP — BUDAPEST LISZT FERENC INTERNATIONAL AIRPORT .. See TWY segments on Chart ADLHBP PDC-1 and PDC In.
Author: | Taugrel Kazrataur |
Country: | Burkina Faso |
Language: | English (Spanish) |
Genre: | Sex |
Published (Last): | 13 September 2007 |
Pages: | 104 |
PDF File Size: | 1.82 Mb |
ePub File Size: | 14.42 Mb |
ISBN: | 864-3-95108-859-3 |
Downloads: | 58138 |
Price: | Free* [*Free Regsitration Required] |
Uploader: | Doshakar |
Engine tests at idle power may be performed at the locations listed in points in section 5. PAPI 3 19 M. Aircraft will be advised of these procedures in an ATIS broadcast with the following expression: The restrictions listed in 1. If engine power testing is necessary between and at the locations listed in point 3 above, the prior written permission of the National Transport Authority Office for Air Transport must also be obtained separately, and must be attached to the request, to be submitted to the AOCC.
The compliance of the engine test with the contents of the authority permission is overseen and checked by the duty airside manager DAM. In case of runway direction 31 Training or certification flights may be authorised for runway 31R.
In case of missed approach request missed approach instructions from Budapest Tower. Calibration flights may be executed on workdays and bank holidays between – The aircraft crew is responsible for the proper execution of the given taxi instructions and for avoiding a collision with other traffic on taxiways and at intersections, by visual reference.
Expected delays will be announced by the appropriate ATC unit. If the pilot-in-command considers the runway-in-use not usable for the reason of safety, he shall request permission to use another runway.
vACCHUN – Virtual Area Control Center Hungary
The start-up and push-back procedures from stand 45 are restricted. Centre line, holding positions on all TWY s. For noise protection reasons, primarily RWY 31R and RWY 13R are to be used by arriving traffic during the night, in compliance with the prevailing legal provisions.
If runway 13R is not available, certification flights may be authorised for runway 13L on workdays between – for aircraft not exceeding a MTOW of tons. Engine tests at idle power may be performed at the following locations, with a maximum of one engine, for a maximum of 5 minutes, without restriction in terms of the time of day:.
The functional testing of aircraft engines on the ground is subject to permission. Requests shall be submitted to the Airport Operations Control Center by: Nose in guidance at aircraft stands on Aprons. Flight documentation Language s used.
Normally, an aircraft will take off and land into the wind, unless safety, runway configuration or traffic conditions determine that a different direction is preferable.
The pilot shall indicate to the ground staff the full release of the parking brakes. Stop bars where appropriate. ARP coordinates and site at AD.
Lhb; from regulations on the use of APUs during nighttime is only possible:. An aircraft may request start up clearance only when: The disconnected ground staff will give approval to commence taxiing.
Practice ILS approaches lybp be allowed only when traffic conditions permit. In case of departing traffic, RWY 31L is to be used for take-off. Arriving aircraft experiencing radio communication failure shall set the transponder to code and:.
Proceed direct to LHBP
Parking on the stands shall be carried out following the ground staff’s visual signals; docking to aviobridges shall be made according to the signals of the SAFEDOCK T system. During the approach, pilots will be informed of:.
In case of arriving traffic, RWY 13R is to be used for landing. After vacating the RWY, without further notice, pilots shall immediately contact Budapest Ground on ATS Units provided with information.
However, in selecting the runway-in-use, ATC shall also take into consideration other relevant factors such as the aerodrome traffic circuits, the length of the runway, the approach and landing aids available, meteorological conditions, aircraft performance, the existence of a preferential runway system and noise abatement.
Bird flocks and bird migrations The size of flocks of birds living at or near Budapest Liszt Ferenc International Airport varies with seasons. Continuous two-way radio contact must be maintained with the unit competent in the area during engine testing. Requests for engine power tests must be sent to the AOCC in advance, at least 24 hours prior to the planned time khbp the engine test. The movement areas at Budapest Liszt Ferenc International Chartx are checked on a regular basis by the duty airside manager.
Aircraft performing calibration flights are exceptions to this rule. Helicopters shall take-off from the position provided by Budapest Tower. Aircraft following the start-up, push-back or power-back procedures should be ready for taxi within 4 minutes after off-block time.
Permission for actual engine start-up must be requested from the unit responsible for traffic management in the given area, by DRR radio or air-to-air radio on the frequency of the competent unit in the given areaand the completion of the engine test must be reported to the same unit. Requests shall be submitted to the Airport Operations Control Center by: Noise Abatement Arrivals 3.